I have a client (AX 2012 CU7) that has a re-occurring (not terribly frequent) issue of the Workflow message processing job get's stuck at 50% executing. My solution is to restart the AOS but since this is a production system (with only one AOS) that is not the most fun thing to do. Anyone got any ideas? I saw a post about trying to find the "SPID" in SQL (I think that is what it was called) and killing it? I have no clue on how to find the "SPID". Also, I think that it is also possible to go into the BATCH and BATCHJOB tables and changing the STATUS of the job there to 0? Can this be done without stopping the AOS?
*This post is locked for comments
I have the same question (0)