Hello All,
I have one doubt regarding Costing method and Costing version to be used for BOMs.
Can I use Standard item model group for BOM/FG Item and MWA Costing method for the Raw materials for BOM Calculations?
For e.g. Lets suppose FG ITEM is set to STD and BOM Lines are Set to MWA and then i run costing calculation for BOM item using Standard cost then will the bom calculation will be generated correctly
I see that in order to generate BOM calculation, i have to give some Std cost price for the RMs although it is has MWA Costing method, then only when i run the BOM Calculation, the costing is getting calculated. What can be the implications of this and what is the suggested approach?
Shall we always suggest to use STD Costing for BOM and BOM Line or MWA for BOM and BOM LInes?I mean to say is that BOM and BOM should always have same Item model group?If not then what is the best practice for suggesting costing method for BOM and BOM line in case of customer is asking for different costing method for these.
Any help will be much appreciated.
Thanks