We have RPO with sub contracting labor. The RPO cost base is USD, while the sub contracting PO in other currency.
On the Purchase's side - I noticed that when we posted the PO, the Vendor Ledger is done correctly with the ACY as well as LCY.
But on the Manufacturing side - the Prod. Order statistic, the Prod Order value entries takes the ACY amount as it is without apply the exchange rate.
Why Navision do this mistake?
Thanks, Yustina
Notes on study case below :
The original cost amout ACY :9000 for 5 pcs, Total ACY cost is ACY45000.
On the Value Entry, it takes the amount of ACY as LCY and times it with exchange rate of 9180??
As well as on the statistic, it mix up the cost in LCY 1.5 and add it with ACY 45000, why?
Edit - Vendor Ledger Entries - WKS ? WORK SHOP BJ | ||||||||
Posting Date | Document Type | Document No. | External Document No. | Vendor No. | Description | Currency Code | Original Amount | Original Amt. (LCY) |
3/19/2012 | Invoice | P-INV+_00035 | WKSYUSTINA002 | WKS | Order P-ORD_00027 | IDR | -9,000.00 | -0.98 |
View - Value Entries - Released Production Order 0109001 Dob on Hook | ||||||||||
Posting Date | Item Ledger Entry Type | Entry Type | Adjustment | Document Type | Document No. | Item Charge No. | Description | Sales Amount (Actual) | Cost per Unit | Cost per Unit (ACY) |
3/19/2012 | Direct Cost | No | Purchase Invoice | P-INV+_00035 | YUSTINA | 0.00 | 9,000.00 | 82,620,000.00 |
Edit - Production Order Statistics - 0108677 ∙ E55133 | |||||
Standard Cost | Expected Cost | Actual Cost | Dev. % | Variance | |
Material Cost | 26.65 | 20.48 | 1.50 | -94.00 | -25.15 |
Capacity Cost | 0.00 | 0.76 | 0.00 | 0.00 | 0.00 |
Subcontracted Cost | 0.00 | 5.29 | 45,000.00 | 0.00 | 45,000.00 |
Capacity Overhead | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Manufacturing Overhead | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Total Cost | 26.65 | 26.53 | 45,001.50 | 168,761.00 | 44,974.85 |
Capacity Need | 6.50 | 0.00 | -100.00 |