While i doing the picking list for the production order, there is an end mark as below:

Normally it means that if there are more materials coming, from my point of view it should be ticked when i do the last picking for a specific production order.

But seems it doesn't matter if i tick it every time, is there any negative impact if i do it all the time ?

many thanks

*This post is locked for comments

I have the same question (0)
  • Suggested answer
    Nesrin Profile Picture
    2 on at
    RE: Production picking list end mark

    Normally you put a tick when you consume less than the proposed quantity. In this way AX treats the remainder on the line as 0. Otherwise even if you post the picking list with a lower consumption, AX considers that you will consume also the rest (up to the proposed quantity) and the quantity stays "on order" or "reserved" (according to your setting).

  • Community Member Profile Picture
    on at
    RE: Production picking list end mark

    [quote user="Nitesh Ranjan"]

    End :

    A selected check box indicates that the operation is finished. The backorder delivery on the BOM of the production is treated as zero, even if the quantity that is reported as finished differs from the quantity that was started.

    Please verify if this explains you the scenario, or you need more details

    [/quote]

    Hi Nitesh

    i think it has nothing to do with the operation, cause operations are controlled by the route/job journal. and it also has nothing to do with the BOM.

  • Suggested answer
    Community Member Profile Picture
    on at
    RE: Production picking list end mark

    End :

    A selected check box indicates that the operation is finished. The backorder delivery on the BOM of the production is treated as zero, even if the quantity that is reported as finished differs from the quantity that was started.

    Please verify if this explains you the scenario, or you need more details

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Andrés Arias – Community Spotlight

We are honored to recognize Andrés Arias as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Community Member Profile Picture

Community Member 4

#2
Guy Terry Profile Picture

Guy Terry 2 Moderator

#2
Martin Dráb Profile Picture

Martin Dráb 2 Most Valuable Professional

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans