- First of all to generate base line forecast the batch take from 2 to 3 hours to finish although the planning optimization is connected.
- Second the record to include filter also is not working.
- Third the bucket Month , Week, day all get the values with month
- Fourth the forecast run only as per the manual demand forecast entry and don't care about the system transaction history
- Fifth, the forecast get the same value for the all months
- Sixth, the machine learning algorithm is not working as if i change between ARIMA, ETS STL or Cobine two model i get the same values.