I don't know if I'm missing something or if someone can point out on how can we activate a cost rollup in future?
Let's say I want to simulate a price increase within my operations and overhead. I'm able to simulate the total cost increase with incremental changes and what I want is to set those cost for the future. So they get picked up at the corresponding date. But as soon I activate the cost roll up, even if I put the from date in the future, the activation date is always the system date.
Why is that? and is there a way to achieve what I want?
Any suggestions would help.
thanks