Hi all,,
I have two operation linked to each other
the first operation (10) has a resource group with quantity 10
the second operation (10) secondary has a resource with quantity 1
when trying to schedule
I trace the error it seems the secondary must be resource group and the number of quantity must equal the primary operation like time issue.
plz any suggestion except to vise versa the operations