Hi All,
I have a query related to Send ahead when using the same in multi level BOM. The BOM's seem to populate correctly in planning worksheet but how do i create routing for the same as the send ahead in the lower levels don't flow to upper level as the sub-components have their own routing with send ahead specified.
It seems to be working when all the routing steps are placed in a single routing, but fails in multi level for send ahead.
Is there something that i am missing in creation of routing, i am facing this issue only with muti level BOM's
Thanks,
Kamesh
*This post is locked for comments