Hello! I have a problem with an item that cannot be planned with Master Planning in AX 2009. The error is: "Primary operation is not specified!". I am attaching image with the error. I have checked the Routes configuration for the item and everything looks ok. Can someone tell me what else can I check in order to resolve this problem?