Hi everybody

I have read some documents in TechNet and Microsoft website . These document said physical amount could be updated through production order report as finish

However, I just test the system, and RAF  didn't update physical amount for my finish goods item. On other hand, I end production order, system only record financial amount and the system also generate CostAmountOperation field.

I really want to know that

Are there any configuration to let system update physical amount for item in RAF steps? or is this standard behavior of system?

Which is purpose of CostAmountOperation field?

My configuration:

In production control parameter, I set up post report as finish in ledger

In item model group, I choose Weight  Average method and I also check post physical inventory check box and include physical value checkbox.

Please kindly give me some information about that.

Thanks you very much

*This post is locked for comments

  • Jack Nguyen Profile Picture
    91 on at
    RE: How AX system update CostPhysicalAmount when Report as Finish

    Hi Mr.Ludwig

    Thank you for your advice.

    I will consider carefully before doing any steps which will make huge impact to the standard system

    Best regards

    Jack Nguyen

  • Verified answer
    Ludwig Reinhard Profile Picture
    Microsoft Employee on at
    RE: How AX system update CostPhysicalAmount when Report as Finish

    Hi Jack  

    To evaluate the raw materials by the average cost price you can create a job that updates the released cost price field with the current running average cost price. This is a quite easy and riskless modification.

    Trying to modify the calculation of the RAF values or something alike can terribly go wrong if not done very careful because many scenarios need to be taken into consideration such as reversals of a production step, changes that are applied by the inventory close, etc. Personally, I would recommend not doing that.

    Best regards

    Ludwig

  • Jack Nguyen Profile Picture
    91 on at
    RE: How AX system update CostPhysicalAmount when Report as Finish

    Hi Mr. Ludwig

    Thank you for reply

    I understand that I need to end production order for recording actual average cost amount.

    However, my scenario is "How to estimate raw materials cost in Price calculation by Weight Average, not lasted cost price?" and I don't  end production at this time, I just want record physical amount of RAF

    I need the physical amount will be close with actual production cost. ( financial amount). Because our country accounting rule request we need to record closing  work-in-process value and work-in-process value exactly. So I want to customize to record RAF physical amount = WIP value and take some actions to calculate Closing WIP without ending production order.

    So I think if I can estimate raw materials cost in price calculation function by Weight Average, I might have some points to resolve my problem

    Can AX standard system resolve that?

    Best regards

    Jack Nguyen

  • Verified answer
    Ludwig Reinhard Profile Picture
    Microsoft Employee on at
    RE: How AX system update CostPhysicalAmount when Report as Finish

    Hi,

    You are right with the estimated cost amount used for the report as finished process step given your setup.

    About the raw material costs:

    AX will use the actual average cost amount when you end the production. If this cost amount is $0 then an adjustment will be recorded with the inventory close or recalculation. Can you let us know why the material cost price is $0?

    Best regards

    Ludwig

  • Jack Nguyen Profile Picture
    91 on at
    RE: How AX system update CostPhysicalAmount when Report as Finish

    Hi Mr. Ludwig

    Thank you for sharing your time for my question. I really appreciate about that.

    I checked the system again and realized that physical amount will be calculated from estimate production cost if I checked "Use estimated cost price" at Production Control parameter.

    However, I faced with the new problem now. I want system estimate raw materials cost by Weight Average, so I setup Cost price model in calculation group = inventory cost but system estimate cost is zero. I only can take lasted cost price of raw materials by setting cost price model = item cost price

    How can I calculated raw material cost price by Weight average, sir?

  • Ludwig Reinhard Profile Picture
    Microsoft Employee on at
    RE: How AX system update CostPhysicalAmount when Report as Finish

    Hi,

    Can you share screenshots that show the missing updates you mentioned? Can you also let us know the exact AX2012 version that you operate?

    Many thanks and best regards

    Ludwig

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Ramesh Kumar – Community Spotlight

We are honored to recognize Ramesh Kumar as our July 2025 Community…

Congratulations to the June Top 10 Community Leaders!

These are the community rock stars!

Announcing the Engage with the Community forum!

This forum is your space to connect, share, and grow!

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Kempeth Profile Picture

Kempeth 4

#1
Andy Adamak Profile Picture

Andy Adamak 4

#1
Community Member Profile Picture

Community Member 4

Featured topics

Product updates

Dynamics 365 release plans