Good day,
Have created several leave types and assigned them to plans. I requested leave X from 01/11/2021 - 09/11/2021 and was sent successfully. I requested leave y using the same date (01/11/2021 - 09/11/2021) to test for collision, the system allowed me to send successfully. This should not happen, any reason (s) why?
Thanks.