Hi,
There is a product names Swtichbox with 2 BOM line items 011201,011202 located at 01-21 location in a Warehouse. A production order is created and released. 2 seperate production picking work is created for each BOM line item as shown below

But i want to have a single work to be created comprising 2 picking activity of 2 BOM line items and one single put away. Is it possible? i need a solution.
Thanks
*This post is locked for comments
I have the same question (0)