
Hi all,
There is a way to force a complete database synchronization of a Project in Visual Studio instead of incremental sync? It seems that the system do no like it too much when you delete\modify direct with SQL Commands.
Thanks
Pedro Rodriguez
*This post is locked for comments
I have the same question (0)I think I found that. „FallbackToNativeSync“.
www.theaxblog.com/microsoft-dynamics-365-for-operations-technical-series-indexing