Hi All,
any one can explain how to use actual and standard cost for manufacturing in AX?
I did a lot of researches but i still have some confusions.
Regards,
*This post is locked for comments
Any Help
What are your detailed confusions, the topic is potentially huge. Basically if you don't use standard costing you are using a form of actual based upon your costing method.
The fundamental difference between using actual cost and standard cost for a manufactured item comes down to what happens when your consumption (material, direct, or indirect labor) varies from the standard.
Any deviation from standard consumption under actual cost causes the inventory receipt of the finished good to adjust accordingly. In other words, the finished good is worth everything you consumed to make it.
Any deviation from standard consumption under standard cost causes a variance (or variances, of which there are different kinds, i.e. quantity, price, lot size, etc.), because the inventory receipt must post at the standard cost regardless of any deviation in consumption to make it.
As a side effect, the scrap account is not used under standard cost, but that's a small detail that most people don't really grasp until they really think it through.
Dynamics AX is a very, VERY strong actual cost system.
Standard cost is more of an afterthought in AX. The system wants to do actual cost everywhere, and just posts variances whenever it can't.
I've never understood why anyone would want to use standard cost at all, let alone in a system that is so good at actual cost.
My question is, which setup in the system that I need to do to inform the system to either use standard cost or actual cost.
as I know, inventory model: FiFo, Lifo and weighted average use actual cost, while standard for standard.
My confusion is how to configure the manufacturing module to use actual cost calculation instead of standard. How to setup in AX? I need only basic steps.
Thank you sir,
I need to know how to setup AX to use Actual cost ?
Does the Item Model Group control this setup or there are any parameters I need to setup in Production Control module?
Regards
It uses the inventory model group costing, there is no specific production flag, an item is an item. Labour is specified in the costing version, as are overheads through the costing sheet.
See Guy's links here.
https://community.dynamics.com/ax/f/33/t/149630
for Production look into costing sheet, bom calculations, Prod order estimation etc.
Also see this series of blog posts: http://shafeaa.blogspot.ae/2015/08/ax-2012-moving-average-costing-method.html
and
http://www.axpulse.com/tag/production-wip-in-microsoft-dynamics-ax/
Microsoft Dynamics AX 2009 White Paper: Cost Management(white paper)
Microsoft Dynamics AX 2009 White Paper: BOM Calculations Using Costing Sheet (white paper)
There is a rather lot to the subject - try the elearning
Appreciate your response, it is enough.
Hi!
My organization is implementing Dynamics 365 as its ERP system. We are a medium sized manufacturing company and we intend to import inventory at standard cost into the system, as it fulfills requirements of the other departments. However, as an accountant, I need to show our auditors the actual purchase price of the components on hand (i.e. moving average). Is there a way I can view the moving average price of my current inventory on hand? I believe there must be a way I should be able to see the actual price of the inventory on hand as the PO and vendor invoice are created at the actual purchase price.
Any help in this regard would be much appreciated!
Under review
Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.
As AI tools become more common, we’re introducing a Responsible AI Use…
We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…
These are the community rock stars!
Stay up to date on forum activity by subscribing.
Priya_K 4
Martin Dráb 4 Most Valuable Professional
Ali Zaidi 2