I'm having trouble trying to figure out why my stores DB's aren't syncing A job data.
The A jobs are scheduled to run and are running. I even check on a stores DB and see that records are being updated by each A job. (Anywhere from 0 - 4000 depending on the A job).
One case I'm having, any new product we send to the store the barcodes come-up as invalid when they scan them. I verify the appropriate A job has made some record updates throughout the day. The only way I can get the barcode to work is to send the corresponding N job to the store.
In the little experience I have in DAX I know that the Process assortments(Scheduled to run once a day) and the Create actions(Scheduled to run every 15 minutes) jobs need be running. In my case they have been running consistently without error. What could I check to attempt in getting A jobs to sync correctly?
NOTE: I know A jobs can get out sync and the data won't apply. In a test I preformed I updated a store with the N job. Making sure it received all the A jobs consistently, new product was sent to the store. They tried scanning the new items and they would fail. This is what makes be believe A jobs aren't syncing the store DB correctly.
*This post is locked for comments
I have the same question (0)