Hi,
We're using Ax 2012. I'm trying to set up a Lean Manufacturing system to get a Kanban system running. I'm following some documentation I found on the web, and I'm now setting up my first production flow. I'm following this instructional video from Lachlan Cash, which is very good.
https://organicax.com/2016/09/07/lean-production-flow-for-simple-manufacturing-step/
But when I get to the end of the Wizard which configures an activity for my production flow, I'm stuck.
(In the video, this is around 3:06, where the wizard is succesfully finished).
I get this error: "Numbers could not be generated because a number sequence reference is missing. Ensure that all necessary number sequences are set up."
I think possibly there is no number sequence set up for the activity, so Ax doesn't know which number to give to it?
But where do I set this up?
How do I do this?
Any help is much appreciated!
Adriaan