web
You’re offline. This is a read only version of the page.
close
Skip to main content

Notifications

Announcements

No record found.

Community site session details

Community site session details

Session Id :
Microsoft Dynamics CRM (Archived)

Multiple instance of CRM Async service running in SQL Server Windows Fail Over Clustering

(0) ShareShare
ReportReport
Posted on by

How should we install and configure CRM Async service in a Clustered SQL Instance (Windows Fail Over Clustering) so that only one instance of Async services should run on an Active/Passive node. While I move the node, I want to automatically run the async services installed in Sql Node 2. ie. When SQL Node 1 is active , all CRM services installed should be running and SQL Node 2 should have all CRM Services with status not running mode. When I switch to Node 2, all CRM Async services should automatically run in Node2. Can anybody please help. Thanks in advance

Many Thanks, Suresh Kumar VC

*This post is locked for comments

I have the same question (0)
  • v22arvind Profile Picture
    65 on at

    So you have a SQL server in cluster mode with two nodes and you want CRM async service to point to active node always?

    If the CRM setup was done on the cluster name instead of a particular node, then any new async service set-up in future will automatically point to the cluster and whole active/passive handling will automatically be taken care off by sql cluster. Please elaborate if I got it wrong.

  • Community Member Profile Picture
    on at

    Hi Arvind,

    Thanks for your reply. Infact, we installed ASYNCCRMCLUSTER.pngit on cluster name. But do I need to get Async Service be running on both nodes simultaneously that when I move the nodes, it automatically moves all the dependent process.

    Best Wishes, Suresh Kumar VC

  • v22arvind Profile Picture
    65 on at

    Ok, so you have async service installed on the db nodes itself?

    Regardless of where the async service is installed, it will point to cluster only(as you have installed CRM on cluster). So, keep both instances running. When one node goes down, the other will handle.

  • Suggested answer
    imayur Profile Picture
    630 on at

    Hi,

    In multiple back end server deployment load will be split automatically, So if one async service server goes down, other instance will serve.  I don't think you can control this behavior,  may be you can write .exe (Programatically using ServiceController in c#) to start services , when you switch.

    Please let us know if you found OOB solution for this.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics CRM (Archived)

#1
SA-08121319-0 Profile Picture

SA-08121319-0 4

#1
Calum MacFarlane Profile Picture

Calum MacFarlane 4

#3
Alex Fun Wei Jie Profile Picture

Alex Fun Wei Jie 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans