I’m running the planning worksheet for an item.
This item has skus in location 10 and 12. item sku in Location 10 is set-up as the make location. item sku in Location 12 is setup with replenishment type “Transfer” from location 10. Now when I use a forecast that has demand only for location 12 and run MRP/MPS for this item. The planning worksheet shows the lines for creating the production orders in location 10 but it doesn't show a line to transfer any of the quantity to location 12. It likes the system realizes I need to make the items based on the forecast but the system ignores that these items need to be transferred to a new location.