Hello,
I'm not that familiar with the Purchase Requisition side of AX 2012 as we weren't using it in my previous role.
That being said I've searched for the answer and spend a good bit of time looking at this in AX here but to no avail.
We have a situation where some purchase requisitions are requiring that a Project Activity Number before they will work, however there are other users that are raising reqs without an activity on the lines and this isn't an issue and working as it was intended to not have an activity number.
Can someone point me in the direction of where to look for this? I've checked the Projects and don't see a difference, the activity check boxes under Setup on both are all unchecked.
Thanks
Craig