Production order and Manufacturing execution

(0) ShareShare
ReportReport
Posted on by 397
Hi all
 
I am using the Manufacturing execution to report on jobs. I want to update the status the production order to be Reported as finished when the last job are finished. What is the setup to fix this?
 
Thanks in advance
Erik
I have the same question (0)
  • Assisted by AI
    Saif Ali Sabri Profile Picture
    2,725 Moderator on at
    Hello Erik, In Manufacturing execution, the status of a production order does not automatically change to Reported as finished when the last job is completed unless specific setup parameters are enabled. This behavior is controlled by the Manufacturing execution configuration and Production control parameters.

    🧩 Key Setup Steps

    • Enable automatic RAF Navigate to Production control > Setup > Manufacturing execution > Manufacturing execution parameters. Under the General tab, enable the option Report as finished when last operation is completed.
    • Check route operation setup Ensure that the last operation in the route is flagged as Route operation = Last. The system uses this marker to determine when the production order can be closed.
    • Validate job completion reporting In the Job registration setup, confirm that Automatic RAF is enabled for the last job. This ensures that when the worker reports the final job as finished, the production order status updates accordingly.
    • Confirm production floor execution configuration If you are using Production floor execution (PFE), check the execution screen setup. The Report progress or Report as finished control must be included in the layout for the last job.
    • Review quantity reporting The system requires that the Good quantity reported in the last job matches the remaining quantity of the production order. If partial quantities remain, the order will not automatically move to Reported as finished.

    ⚙️ Recommended Process Flow

    1. Configure Manufacturing execution parameters with Report as finished when last operation is completed.
    2. Mark the final route operation as Last.
    3. Ensure workers report the last job with the correct quantity.
    4. The system will automatically update the production order status to Reported as finished.

    💡Additional Note

    If you want the system to also post the RAF journal automatically, enable Automatic posting under Production control parameters > Report as finished. Otherwise, the order will move to Reported as finished but still require manual journal posting.
  • EGrotberg Profile Picture
    397 on at
    Hi Saif
     
    I can't find the option Report as finished when last operation is completed
     

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Season of Sharing Community Challenge Launch!

Jump in, show your community spirit, and win prizes!

Women in Power Builds Momentum

Expanding mentorship, skilling, and AI innovation

Congratulations to the May Top 10 Community Leaders

These are the community rock stars!

Leaderboard > Supply chain | Supply Chain Management, Commerce

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 149 Super User 2026 Season 1

#2
Abhilash Warrier Profile Picture

Abhilash Warrier 102 Super User 2026 Season 1

#3
Subra Profile Picture

Subra 90

Last 30 days Overall leaderboard

Product updates

Dynamics 365 release plans