I want to change which phases (Timestamps) are calculated into the "Total Billable Duration" of a Booking.
Reason: It looks strange to me that "on break" times automatically get billed whereas travel times don't.
However I can't find our where to tell the system which of the ressource times I want to be billable.
Can anyone help me?