Running NAV 5.0 SP1 application on 2009 R2 platform
For small number of finished production orders the cost of labour and labour overhead were not moved from WIP to Finished Goods. Capacity postings were made after output was posted and before the order was finished.
*This post is locked for comments
I have the same question (0)