Hi guys,
I have the below scenario on production order, wonder if anyone can provide me some guide
Am am running weight average cost (actual cost) for my inventories item.
I am expecting my setup cost to be base on my run qty
My scenario Production order 1
BOM setup
FG cost = 600 (base on standard formula)
Material
RAW 1 = 100 (cost)
RAW 2 = 100
Route:
Machine 1 (Machine cost)
Run time = 200 (2 hours for 100 qty)
Setup time = 200 (cost) (Expected the 200 cost is for run time of f 100 qty)
i am expecting the result below:
If i start my production order for 50 qty, system can auto calculate my setup cost as 100 [ base on formula (50/100)*200 ]
I am expected the cost to be lower
FG cost = 400
Material
RAW 1 = 100 (cost)
RAW 2 = 100
Route:
Machine 1 (Machine cost)
Run time = 100 ( base on formula 2 hours for 100 qty)
Setup time = 100 (expected lower cost) (Expected the 100 cost is for run time of 50 qty)