
While I was trying to update the budget control configuration, I faced an error message that was generic and didn't tell much.
We proceeded with technical and functional investigations without success. All we could find is that the budget control configuration creates a line in the background, and whenever you create a draft, a new line is added; however, once you activate this draft, the old line gets deleted automatically, and this is not happening in our system. Thus, I wanted to share it here; maybe someone encountered this issue before. If it is the case, please let me know how you dealt with it.
Thanks in advance.