I appreciate your reply GuyUK!
Example 1:
I have two main processes, knitting, and laundry.
After I finish the knitting process, I assign a classification number to that production batch.
For example, "This production batch can only be used to be colored in dark tones"
How can I reflect that in my Master Planning?
----------------------------------------------------
Example 2:
I have 3 items, each has its route that finishes with the coloring process (in this case to color yellow)
I have 3 production orders, each order is assigned to a laundry machine of 200-liter capacity
In the end, I need to program the 3 orders in a 600-liter capacity laundry machine to optimize resources (considering the color is the same on the 3 orders).
How can I reflect that in my Master Planning?
----------------------------------------------------
Example3:
I have a process that runs over a schedule to guarantee fabric characteristics.
Each production order has its batch number.
In the laundry final process, NO different batch numbers can be processed together.
How can I reflect that in my Master Planning?
----------------------------------------------------