Man - machine job registration AX 2012

(0) ShareShare
ReportReport
Posted on by 465

We are upgrading from AX2009 to 2012 and there are som changes in the job registration form I don't like.

In our route setup we separate machine and man time on primary ande secondary operation, since we would like to report time om machine and personell separately. Each machine has it's own "worker"-id.

In the old version, 2009, in the job registration form (Shop floor control) we started the jobs separately. First we started the machine work for the machine (with one job-id) and immediately after we started the job-id for the secondary operation with the workers id, by entering the id-number in the workers field.

In AX 2012 you have to login with the worker-id who is supposed to do the registration, which forces you to log in and out multiple times. Is there a better way to stay in the same form (without having to log in twice) to start machine and man job?

Or, is there a better way to register time on machine and man separately?

*This post is locked for comments

I have the same question (0)
  • Fredrik Sætre Profile Picture
    12,644 on at

    You don't have to log in as that user. Turn off the job verification in your terminal settings and you can start any job from any worker.

  • Fredrik Sætre Profile Picture
    12,644 on at

    But do you run the machine without a person attending it? What time are you looking to capture (man and machine)? Are your workers accurate enough to register this? How big variations are you seeing?

  • Fredrik Sætre Profile Picture
    12,644 on at

    But do you run the machine without a person attending it? What time are you looking to capture (man and machine)? Are your workers accurate enough to register this? How big variations are you seeing?

    Can you use two parallell primary operations instead of a secondary?

  • HenkeNord Profile Picture
    465 on at

    Yes, we have a person starting the job, about 15 minutes, then they prepare next job or perform some manual jobs on an other production order. We plan and measure on the primary operation (machine), but we calculate with labor cost as well.

    Two parallell operations could be a solution, but still you have to log in twice, don't you?

  • HenkeNord Profile Picture
    465 on at

    But where do you enter the worker-id, if you don't log out and in again?

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Season of Sharing Community Challenge Launch!

Jump in, show your community spirit, and win prizes!

Women in Power Builds Momentum

Expanding mentorship, skilling, and AI innovation

Congratulations to the April Top 10 Community Leaders

These are the community rock stars!

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
CP04-islander Profile Picture

CP04-islander 21

#2
dekion Profile Picture

dekion 4

#2
Virginia99 Profile Picture

Virginia99 4

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans