Hi
We have a problem trying to create Works after releasing a Production order for a Finished good. The production order is required by a Sales order requirements explosion, and the Finished good has a BOM that includes raw materials and a sub-produced item.
Everything works fine, except for the message that says: "The total quantity for production BOM #### could not be fulfilled". The wave and work are succesfully created to perform the picking of the raw materials, but not for the sub-produced item, as if the work neither validated there was on-hand stock, nor tried to look for a location to pick.
What could be the problem?