Hello,
I have a batch job to invoice all delivered SO's to run at 11:45 PM local time (Arizona) and this job is ending by 11:47 PM local time, however my financial posting date is being forward dated. Why is the job getting a future date on this posting? Even though the job is running "today" in the local time zone, is there a master setup that is controlling the posting date that I am not aware of?
For example. The batch job was ran at 11:45 PM Arizona time on 5/18 to invoice all shipped orders, yet the financial posting date is 5/19.
How can I run the job as close to midnight local time as possible and get the correct posting date?
Thank you,
Brian.