Scrapping items on a production order

(0) ShareShare
ReportReport
Posted on by

What's the best way to scrap items on a production order? For example, once in a while there's a production issue on one of the route operations and all production order items need to go to scrap. The material has been consumed and time has been spent on completed route operations.

Thanks

*This post is locked for comments

I have the same question (0)
  • André Arnaud de Calavon Profile Picture
    301,079 Super User 2025 Season 2 on at

    Hi S3rg,

    You can use the bad quantity field on the report as finished job to register this.

  • Community Member Profile Picture
    on at

    I did test this previously and I entered the whole order quantity in error quantity field and then reported that production order as finished. The problem is that I cannot end the production order by clicking on the Process >End button. It throws an error - "Missing report as finished quantity". But if I create a Reported as finished journal with good quantity 1 and then the rest as error quantity, then I'm able to end production order (Process >End button)

  • Verified answer
    Community Member Profile Picture
    on at

    Looks like this is a DAX "issue". According to multiple threads posting 1 as good quantity and the rest as error quantity is the best workaround so that DAX can adjust costs. Then that 1 part can be cycle counted. This is the processed that we've been following and I just wanted to check if there was a proper way to handle it.

    community.dynamics.com/.../35980

    dynamicsuser.net/.../343900.aspx

    Thanks

  • Verified answer
    Weaveriski Profile Picture
    23,620 Moderator on at

    You have to report 1 because AX has to post the costs. A design anomaly/deficiency but we live with what we have. Book 1 in which absorbs all the costs and then write it off (with a movement journal to scrap!)

  • Community Member Profile Picture
    on at

    That's exactly how we've been doing it. Doesn't seem very logical but I understand why DAX requires it.

    Thanks all!

  • AlejandroMtz Profile Picture
    70 on at

    Hi Steven..   Can you please details the "write off"  procedure.. I found a comment from you in this post here

    and looks pretty much the same.. I need to report only scrap to a Work order, but as seems I need to report 1 OK, then my Scrap Qty and then Write Off the 1 I RAF.

    However I don't really know how to do that.. I only know how to report it in the Work order..

    Thanks in advance.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Martin Dráb Profile Picture

Martin Dráb 4 Most Valuable Professional

#1
Priya_K Profile Picture

Priya_K 4

#3
MyDynamicsNAV Profile Picture

MyDynamicsNAV 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans