Hello,
we have a customer requirement for the following:
The system must be able to handle optimized multi-day scheduling.
What does multi-day scheduling mean in this scenario? It means that monday, the resource A has the start location as is home and end location the hotel. The 2nd day he has the start location the hotel of the previous night and the end location the next hotel or the same, and this goes on until friday, where the end location is again the resource location.
Problem:
I cannot select different address as start and location for different days.
What we tried or thought about:
a) create the Hotels as Organizational units, and have something to change the start location and end location in that interval of days. But this would pollute the OUs if we want to use them in the future for what they are made of.
b) create dummy work orders that go from 8pm to 7am the next day, to see if we can keep the start location of the ressource at the hotel the next day. The system is smart and calculates again the travel time from the resource address and not from the hotel.
All of this need to also optimized.
Any help would be appreciated.